2019 © Shell Global Solutions

CASE STUDY

Shell Filter Trays Impact on Gas Oil Hydrotreater Cycle Length


Shell Filter Trays Impact on Gas Oil Hydrotreater Cycle LengthThe Diagnosis

This specific refinery was experiencing a high-pressure drop across reactor beds, contributing to a restricted cycle length to under a 12 months.

The Discovery

By replacing reactor internals with Shell hardware, the refinery was able to mitigate pressure drop issues and increase cycle length significantly.

Learn how Shell hardware increased gas oil hydrotreater cycle length.

Read the Case Study