CASE STUDY
Shell Filter Trays Impact on Gas Oil Hydrotreater Cycle Length
The Diagnosis
This specific refinery was experiencing a high-pressure drop across reactor beds, contributing to a restricted cycle length to under a 12 months.
The Discovery
By replacing reactor internals with Shell hardware, the refinery was able to mitigate pressure drop issues and increase cycle length significantly.