shell-logo
CASE STUDY

Increasing Gas Oil Hydrotreater Cycle Length by 300% with Shell Filter Trays and Reactor Internals

US Refinery Case Study Filter Trays Impact on Gas Oil Hydrotreater Cycle LengthA non-Shell US refinery’s cycle length was consistently limited to between 9 and 12 months. This was a result of a high-pressure drop across reactor beds.

Attempts were made to remedy the performance issue but nothing was making a substantial impact.

The solution? Combined Shell Filter/High-Dispersion Trays.

When the reactors' hardware was upgraded with Shell Filter/High-Dispersion Trays, cycle length for the gas oil hydrotreater (GOHT) was increased by 300%.

Contrast this with the marginal 16% improvement from the initial attempts and it's clear to see the value of state-of-the-art hardware.

Get the US refinery case study to learn more.

Access the case study